Substation (HV, MV, LV)

Sub-Station
-
Survey & Design,
-
Sand Filling,
-
Civil Construction & Electrical Installation ,
-
Testing and Commissioning of substation up to 400 KV.
Sub- Station Design
-
Single Line Diagram Preparation.
-
Site Survey & Layout Design.
-
Project Schedule preparation and complete set of estimation of all kinds of works.
-
Consultancy, Drawing and Requirement to connect with transmission lines.
-
Earthling / Grounding System Design (IEEE - 80).
-
Equipment Specification Check.



Previous
Next



Previous
Next
Sub-Station Engineering
-
Fault Level Calculation
-
Earth Resistivity Test and Calculation
-
Step and Touch Voltage Calculation
-
Cable Sizing Calculation
-
CT, PT Sizing Calculation
-
Relay Setting Calculation
-
Secondary Scheme, Protection Scheme Design
-
Cable Scheduling.
Civil Work
-
Soil Survey, Investigation, Land Survey, Soil Test, Design of Sub-station
-
Land Development works of Sub-station
-
Civil Construction work of Sub-station GIS Building, Control Building, Aux. power Room & Water feeding Room, Equipment Base, Boundary wall, Roads etc.
-
Civil Construction of Transmission Line, Foundation, Pile Work, Pile Integrity Test and Pile Load Test, Material Supply.



Previous
Next



Previous
Next
Testing and commissioning
With a huge number of Testing Equipment/Tool and Experts, ATI is fully capable to Test and Commission up to 400kV without any other Expert support. ATI provides-
-
Ratio, Polarity, Tan-Delta, Insulation Resistance, Winding Resistance, Polarity, Capacitance.
-
Breaker Timing and Analyzing
-
Transformer Oil Test
-
Protection Relays Test of ABB, SIEMENS.